Map out 60–90 day project timelines backward from site handover: coordinate MEP rough-in measurements, shop drawing sign-off, 30-day custom joinery production, and container booking.
Calculate true landed cost for heavy containers: compare CIF port arrival against DDP site delivery, including ISF filing, anti-dumping duties on ceramics, port demurrage, and tail-lift unloading.
Prevent transit breakage in mixed FCL loads: specify ISPM-15 fumigated A-frames for stone slabs, corner-protected flat packs for cabinetry, and room-by-room crate labeling for fast site sorting.
Specify porcelain tiles by test metrics: verify R10/R11 slip ratings (DIN 51130) for wet shower floors, <0.5% water absorption (ISO 10545-3) for freeze-thaw patios, and 20mm paver load ratings.