Dedicated container / FCL
Review loading sequence, total mass, restraint and unloading access for the complete batch. A dedicated container does not remove the need for an agreed packing plan.
United States / shipping scope
Plan the route from the ready-to-ship material list to the US receiving location. Compare freight offers on the same packing data and handover scope, then confirm who handles each step before booking.
Request US Shipping Scope
USA / transport scope
Match items to the current package list.
Review packing, documents and named approval.
Confirm carrier acceptance and shipment references.
Importer and broker review the actual consignment.
Receiver arranges access, unloading and exception records.
Confirm the booked port, terminal and onward delivery arrangements for the actual shipment.
Packing / receiving
| Material | Packing questions | Receiving questions |
|---|---|---|
| Cabinetry | Flat-pack or assembled? Protect corners and exposed finishes; identify hardware cartons. | Who checks cabinet IDs against room and assembly drawings? |
| Tile and stone | Confirm gross mass, pallet stability, edge protection and lifting method. | Can the receiving equipment handle each packed unit? |
| Windows and glazing | Confirm supported orientation, frame restraint and separation of glass surfaces. | Is unloading equipment compatible with the crate and lifting points? |
| Sanitary ware and fittings | Protect brittle ceramic edges; separate small fittings and labelled accessory boxes. | How are concealed damage and missing parts recorded? |
The destination brief
Confirm the receiving arrangement before comparing transport offers.

City and ZIP code; site or warehouse; appointment rules, vehicle access, unloading equipment and storage.
Name the importer, broker, forwarder and receiver. Agree who resolves missing documents and who approves the release.
Compare origin work, main carriage, US arrival and final delivery separately. Use the cost register below to record exclusions and provisional items.
Plan the US material package ↗02 / compare the same scope
Ask the forwarder to assess package sizes, weights, readiness and receiving conditions before recommending FCL, LCL or split delivery.
Review loading sequence, total mass, restraint and unloading access for the complete batch. A dedicated container does not remove the need for an agreed packing plan.
Identify handling points, package protection and destination collection or delivery scope. Compare the full origin and destination charge breakdown.
Compare storage, repeated handling and separate deliveries against the cost of waiting for unresolved items. Record the accepted split by item ID.
Compare origin handling, main carriage, destination charges and local delivery. Mark included, excluded and provisional costs.
| Origin work | Pickup point, supplier collections, consolidation, packaging work, export documentation and origin handling, with the party responsible for each. |
|---|---|
| Main carriage | Quoted route and transport mode, currency, validity, surcharges and any cargo insurance arrangement; check the actual coverage and exclusions separately. |
| US arrival | Destination terminal or warehouse handling, customs brokerage, applicable duties and taxes, possible examinations, and any storage or equipment-related charges to be assessed for this shipment. |
| Final delivery | US destination city and ZIP code, commercial or residential access, vehicle restrictions, unloading equipment, appointment needs and the agreed handover point. |
| Quote assumptions | Package count, outside dimensions with units, gross weight, stackability, declared cargo characteristics and expected readiness; revise the quote if these change. |
Agree a named delivery point and written responsibilities for the forwarder, broker, importer and receiver.
| Supplier / KUCI scope | Confirm the ordered goods, packing list, readiness and any agreed coordination work. Identify who supplies each document and who approves release. |
|---|---|
| Forwarder / carrier | Confirm booking acceptance, transport arrangements, cutoff information, shipment references and who communicates schedule changes. |
| US importer / broker | Identify the importer and filing agent. Review entry documents and the applicable Importer Security Filing requirements before loading; confirm deadlines with the responsible professional. |
| Receiving team | Confirm site access and unloading, match delivered packages to the agreed list, and record exceptions under the applicable delivery and claims terms. |
Share package dimensions and gross weights, readiness by supplier, destination ZIP code and the proposed receiving arrangement. Identify the freight scope you want compared.
Request US Shipping Scope