What is actually being supplied?
Manufacturer, model, composition, origin, quantity, finish and intended use. Match these to the invoice and current drawing revision.
Australia / A shipment-specific plan
Resolve the goods, the packaging and the destination together. Build a review pack that follows each material from selection to site receipt.
Discuss Australian Import Requirements Explore the review pack ↓
Begin with the material schedule
Use a stable item ID across the quotation, drawing, evidence file and packing list. Keep substitutions and missing records visible until the responsible reviewer resolves them.
Suggested procurement workflow. The appointed professionals determine requirements for the actual shipment and installation.
Manufacturer, model, composition, origin, quantity, finish and intended use. Match these to the invoice and current drawing revision.
Separate the model record from the brochure. Ask the local reviewer to identify applicable reports, labels and installation details.
Build the evidence request ↗ABF advises importers to investigate materials and supply chains before buying; an “asbestos free” label alone is insufficient assurance. Agree suitable evidence and any sampling or accredited testing before shipment.
ABF asbestos guidance ↗
Review the packaging separately
Identify pallets, crates, bearers and dunnage as well as the goods inside. Record their actual materials and the applicable treatment, marks and declaration requirements.
DAFF directs packaging supporting other commodities and packaging imported as a commodity to different BICON cases. Select the pathway for the actual use.
Conditions vary by material and processing. Ask the packer and biosecurity adviser to confirm the actual composition and current conditions; do not apply a blanket treatment assumption.
Before dispatch / Before arrival
Reconcile invoice quantities, packing-list counts and package marks. Confirm outside dimensions, gross weights and package-to-item mapping.
Name the importer and appointed broker. Resolve classification, valuation, origin, declarations and current charges for the actual goods.
ABF declarations ↗Agree site access, unloading equipment, protected storage and inspection. Connect the package IDs to the rooms and installation sequence.
Bring the information you have
Include state and postcode, project stage, model references, proposed packaging, available documents and the requested receiving window. Ask for freight, entry, destination and installation exclusions separately.
Open the blank review worksheet · TXT ↗The quotation form currently previews the brief locally. Sending and uploads remain unavailable.