KUCI Gallery | US shipment coordination worksheet Blank planning aid | Local preview | 3 November 2026 This is not a customs filing document or a complete regulatory checklist. The appointed import professional confirms requirements for the actual goods. PROJECT Project reference: State / city: Drawing revision and controlling unit: Requested receiving window (not a confirmed delivery date): Receiver / unloading and storage plan: ITEM SCHEDULE - repeat for each item Item / room ID: Manufacturer / model / configuration: Material / finish / quantity: Approved drawing / sample reference: Evidence required / reviewed by / outstanding decision: Package ID / contents / count: Package dimensions / gross and net weight: BEFORE DISPATCH - enter owner, evidence and status for each line [ ] Item schedule and substitutions resolved [ ] Invoice descriptions, quantities, values and origin reviewed [ ] Packing list reconciled to package marks and contents [ ] Product evidence matched to the exact offered model [ ] Applicable composite wood requirements reviewed where relevant [ ] Applicable wood packaging conditions and marks reviewed [ ] Classification, valuation, entry and filing requirements reviewed [ ] Importer and broker responsibilities agreed [ ] Goods, packing, freight, insurance and destination charges separated [ ] Site access, unloading equipment and receiving inspection agreed RECEIPT Package count / condition / inspection record: Discrepancy reference / photographs / date / agreed reporting contact: Keep tax IDs, identity documents and private customer details out of this worksheet.